Journal of Civil Engineering and Management

Papers
(The median citation count of Journal of Civil Engineering and Management is 3. The table below lists those papers that are above that threshold based on CrossRef citation counts [max. 250 papers]. The publications cover those that have been published in the past four years, i.e., from 2020-03-01 to 2024-03-01.)
ArticleCitations
ANALYSIS OF STOCHASTIC PROCESS TO MODEL SAFETY RISK IN CONSTRUCTION INDUSTRY76
USING A TAM-TOE MODEL TO EXPLORE FACTORS OF BUILDING INFORMATION MODELLING (BIM) ADOPTION IN THE CONSTRUCTION INDUSTRY75
THE ANALYSIS OF BARRIERS TO BIM IMPLEMENTATION FOR INDUSTRIALIZED BUILDING CONSTRUCTION: A CHINA STUDY52
IMPACT OF CONSUMER PREFERENCE ON THE DECISION-MAKING OF PREFABRICATED BUILDING DEVELOPERS46
RESEARCH ON INVESTMENT RISK INFLUENCE FACTORS OF PREFABRICATED BUILDING PROJECTS37
COLLABORATIVE PROJECT DELIVERY METHODS: A SCOPING REVIEW36
DEVELOPMENT OF K-BIM E-SUBMISSION PROTOTYPICAL SYSTEM FOR THE OPENBIM-BASED BUILDING PERMIT FRAMEWORK29
RISK PREDICTION AND DIAGNOSIS OF WATER SEEPAGE IN OPERATIONAL SHIELD TUNNELS BASED ON RANDOM FOREST29
INFLUENCE OF CONSUMER PREFERENCE AND GOVERNMENT SUBSIDY ON PREFABRICATED BUILDING DEVELOPER’S DECISION-MAKING: A THREE-STAGE GAME MODEL28
LIFE CYCLE SUSTAINABILITY ASSESSMENT FOR MULTI-CRITERIA DECISION MAKING IN BRIDGE DESIGN: A REVIEW28
APPLICATION OF MULTIPLE CRITERIA DECISION MAKING METHODS IN CONSTRUCTION: A SYSTEMATIC LITERATURE REVIEW27
A FUZZY DECISION SUPPORT SYSTEM FOR SUSTAINABLE CONSTRUCTION PROJECT SELECTION: AN INTEGRATED FPP-FIS MODEL24
FACTORS CAUSING REWORK AND THEIR IMPACT ON PROJECTS’ PERFORMANCE IN EGYPT22
THE WILLINGNESS TO ADOPT THE INTERNET OF THINGS (IOT) CONCEPTION IN TAIWAN’S CONSTRUCTION INDUSTRY21
PREDICTING BEHAVIOURAL RESISTANCE TO BIM IMPLEMENTATION IN CONSTRUCTION PROJECTS: AN EMPIRICAL STUDY INTEGRATING TECHNOLOGY ACCEPTANCE MODEL AND EQUITY THEORY21
APPLICATIONS OF FUZZY MULTIPLE CRITERIA DECISION MAKING METHODS IN CIVIL ENGINEERING: A STATE-OF-THE-ART SURVEY19
RESILIENCE-COST TRADEOFF SUPPLY CHAIN PLANNING FOR THE PREFABRICATED CONSTRUCTION PROJECT18
AN ASSOCIATION RULE MINING MODEL FOR THE ASSESSMENT OF THE CORRELATIONS BETWEEN THE ATTRIBUTES OF SEVERE ACCIDENTS17
MODELLING OF TIME, COST AND RISK OF CONSTRUCTION WITH USING FUZZY LOGIC17
BARRIERS TO THE ADOPTION OF NEW SAFETY TECHNOLOGIES IN CONSTRUCTION: A DEVELOPING COUNTRY CONTEXT16
A NOVEL DECISION-MAKING MODEL FOR SELECTING A CONSTRUCTION PROJECT DELIVERY SYSTEM16
A HOLISTIC LITERATURE REVIEW OF BUILDING INFORMATION MODELING FOR PREFABRICATED CONSTRUCTION16
THE IMPACT OF ORGANISATIONAL RESILIENCE ON CONSTRUCTION PROJECT SUCCESS: EVIDENCE FROM LARGE-SCALE CONSTRUCTION IN CHINA16
ENHANCEMENT OF BID DECISION-MAKING IN CONSTRUCTION PROJECTS: A RELIABILITY ANALYSIS APPROACH14
UTILIZATION OF BIM IN THE CONSTRUCTION OF A SUBMARINE TUNNEL: A CASE STUDY IN XIAMEN CITY, CHINA14
EVOLUTIONARY GAME ANALYSIS FOR RENT-SEEKING BEHAVIOR SUPERVISION OF MAJOR INFRASTRUCTURE PROJECTS BASED ON PROSPECT THEORY13
A MODEL FOR EVALUATING CAUSES OF WASTES AND LEAN IMPLEMENTATION IN CONSTRUCTION PROJECTS13
PHYSICAL PARAMETERS, TENSILE AND COMPRESSIVE STRENGTH OF DOLOMITE ROCK SAMPLES: INFLUENCE OF GRAIN SIZE13
A REVIEW ON LIFE CYCLE COST ANALYSIS OF BUILDINGS BASED ON BUILDING INFORMATION MODELING12
CAUSAL MAPPING TO EXPLORE EMERGENCE OF CONSTRUCTION DISPUTES12
PREFABRICATED HOUSING SUBSIDY ANALYSIS IN CHINA BASED ON AN EVOLUTIONARY GAME MODEL12
CONCEPTUALISING BUILDING INFORMATION MODELLING FOR CONSTRUCTION EDUCATION11
RELATIONAL CONTRACTING AND ITS COMBINATION WITH THE BIM METHODOLOGY IN MITIGATING ASYMMETRIC INFORMATION PROBLEMS IN CONSTRUCTION PROJECTS11
PROPOSED PROCEDURE FOR OPTIMAL MAINTENANCE SCHEDULING UNDER EMERGENT FAILURES11
SCIENTOMETRIC REVIEW OF CONSTRUCTION PROJECT SCHEDULE STUDIES: TRENDS, GAPS AND POTENTIAL RESEARCH AREAS11
COMPARATIVE ANALYSIS ON INTERNATIONAL CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT POLICIES AND LAWS FOR POLICY MAKERS IN CHINA10
DEVELOPING A COMPREHENSIVE RISK ASSESSMENT MODEL BASED ON FUZZY BAYESIAN BELIEF NETWORK (FBBN)10
SIMPLIFIED NEUTROSOPHIC INDETERMINATE DECISION MAKING METHOD WITH DECISION MAKERS’ INDETERMINATE RANGES10
MODELING OF PAVEMENT ROUGHNESS UTILIZING ARTIFICIAL NEURAL NETWORK APPROACH FOR LAOS NATIONAL ROAD NETWORK10
KNOWLEDGE MANAGEMENT IN THE CONSTRUCTION INDUSTRY: CURRENT STATE OF KNOWLEDGE AND FUTURE RESEARCH10
ENERGY-SAVING BUILDING PROGRAM EVALUATION WITH AN INTEGRATED METHOD UNDER LINGUISTIC ENVIRONMENT10
RESEARCH ON PERFORMANCE MEASUREMENT AND SIMULATION OF CIVIL AIR DEFENSE PPP PROJECTS USING SYSTEM DYNAMICS9
SUSTAINABILITY ANALYSIS OF REUSED INDUSTRIAL BUILDINGS IN CHINA: AN ASSESSMENT METHOD9
AN ANALYTIC NETWORK PROCESS BASED RISK ASSESSMENT MODEL FOR PPP HYDROPOWER INVESTMENTS9
BUSINESS STRATEGY DEVELOPMENT MODEL FOR APPLYING KNOWLEDGE MANAGEMENT IN CONSTRUCTION9
TEXT MINING-BASED PATENT ANALYSIS OF BIM APPLICATION IN CONSTRUCTION9
USE OF BIM WITH PHOTOGRAMMETRY SUPPORT IN SMALL CONSTRUCTION PROJECTS. CASE STUDY FOR COMMERCIAL FRANCHISES9
CYBERSECURITY ASSESSMENT OF BIM/CDE DESIGN ENVIRONMENT USING CYBER ASSESSMENT FRAMEWORK9
EMPIRICAL SHEAR BASED MODEL FOR PREDICTING PLATE END DEBONDING IN FRP STRENGTHENED RC BEAMS9
CAUSES AND EFFECTS OF POOR COMMUNICATION IN THE CONSTRUCTION INDUSTRY IN THE MENA REGION8
INFLUENCE OF INSTITUTIONAL PRESSURE ON MEGAPROJECT SOCIAL RESPONSIBILITY BEHAVIOR8
STRUCTURAL E-PERMITS: AN OPENBIM, MODEL-BASED PROCEDURE FOR PERMIT APPLICATIONS PERTAINING TO STRUCTURAL ENGINEERING8
EVALUATING THE SAFETY PERFORMANCE OF CHINA’S PROVINCIAL CONSTRUCTION INDUSTRIES FROM 2009 TO 20178
A BIM-BASED IDENTIFICATION AND CLASSIFICATION METHOD OF ENVIRONMENTAL RISKS IN THE DESIGN OF BEIJING SUBWAY8
UNDERSTANDING THE STRUCTURAL BEHAVIOR OF HISTORICAL BUILDINGS THROUGH ITS CONSTRUCTIVE PHASE EVOLUTION USING H-BIM WORKFLOW7
ENHANCEMENT OF EXTERNAL WALL DECORATION MATERIAL FOR THE BUILDING IN SAFETY INSPECTION METHOD7
THE IMPACT OF THE INTERNATIONAL CONSTRUCTION STANDARD APPLICATION CAPABILITY ON CONTRACTORS’ COMPETITIVENESS: CHINESE CONTRACTORS’ EXPERIENCE7
SUSTAINABLE SUPPLY CHAIN MANAGEMENT IN CONSTRUCTION: AN EXPLORATORY REVIEW FOR FUTURE RESEARCH7
COMPARISON OF PREDICTED FAILURE AREA AROUND THE BOREHOLES IN THE STRIKE-SLIP FAULTING STRESS REGIME WITH HOEK-BROWN AND FAIRHURST GENERALIZED CRITERIA7
QUANTIFYING AND MAPPING THE EVOLUTION OF A LEADER JOURNAL IN THE FIELD OF CIVIL ENGINEERING7
EXPERT PANEL ON IN-SITU VISUAL INSPECTIONS FOR MASONRY CHURCHES MAINTENANCE STAGE7
DEVELOPMENT AND TESTING OF GLOW-IN-THE-DARK CONCRETE BASED RAISED PAVEMENT MARKER FOR IMPROVED TRAFFIC SAFETY7
STUDY ON SEISMIC RESPONSE OF A NEW STAGGERED STORY ISOLATED STRUCTURE CONSIDERING SSI EFFECT7
SCHEDULING OF REPETITIVE CONSTRUCTION PROCESSES WITH CONCURRENT WORK OF SIMILARLY SPECIALIZED CREWS6
NUMERICAL MODELLING OF THERMAL REGIME OF RAILWAY TRACK - STRUCTURE WITH THERMAL INSULATION (STYRODUR)6
PROTOCOL DEVELOPMENT: LEVEL OF PREVENTIVE ACTION METHOD, CONSIDERING THE PREVENTIVE ENVIRONMENTS IN CONSTRUCTION WORKS6
A FRAMEWORK FOR EVALUATING AN INTEGRATED BIM ROI BASED ON PREVENTING REWORK IN THE CONSTRUCTION PHASE6
BEHAVIOUR OF HIGH-STRENGTH CONCRETE CIRCULAR COLUMNS CONFINED BY HIGH-STRENGTH SPIRALS UNDER CONCENTRIC COMPRESSION6
INTERPRETIVE STRUCTURAL MODELING IN EARNED VALUE MANAGEMENT6
DETERMINANTS FOR COOPETITION STRATEGIES OF INTERNATIONAL JOINT VENTURES IN HIGH-SPEED RAILWAY PROJECTS6
EXPLORING THE RISK TRANSMISSION CHARACTERISTICS AMONG UNSAFE BEHAVIORS WITHIN URBAN RAILWAY CONSTRUCTION ACCIDENTS6
WHAT MOTIVATES STAKEHOLDERS TO ENGAGE IN COLLABORATIVE INNOVATION IN THE INFRASTRUCTURE MEGAPROJECTS?6
MECHANICAL PERFORMANCE OF RECYCLED AGGREGATE SELF-CONSOLIDATING CONCRETE COLUMN5
EXPERIMENTAL STUDY ON THE DYNAMIC BEHAVIOR OF RUBBER CONCRETE UNDER COMPRESSION CONSIDERING EARTHQUAKE MAGNITUDE STRAIN RATE5
PERFORMANCE STUDY OF SC WALL BASED ON EXPERIMENT AND PARAMETRIC ANALYSIS5
PARTICIPANT TRUSTWORTHINESS ANALYSIS IN THE GAME-BASED URBAN PLANNING PROCESSES BY PROMETHEE-MGQNN APPROACH5
RENT-SEEKING DECISIONS OF THE MAIN PARTICIPANTS IN CONSTRUCTION PROJECTS BASED ON EVOLUTIONARY-GAME AND SYSTEM DYNAMICS5
SAFETY RISK EVALUATIONS OF DEEP FOUNDATION CONSTRUCTION SCHEMES BASED ON IMBALANCED DATA SETS5
SCHEDULING REPETITIVE CONSTRUCTION PROJECTS: STRUCTURED LITERATURE REVIEW5
DECENTRALIZED SYSTEM FOR CONSTRUCTION PROJECTS DATA MANAGEMENT USING BLOCKCHAIN AND IPFS5
THE CASCADE EFFECT OF COLLABORATIVE INNOVATION IN INFRASTRUCTURE PROJECT NETWORKS5
AN INTEGRATED MULTI-OBJECTIVES OPTIMIZATION APPROACH ON MODELLING PAVEMENT MAINTENANCE STRATEGIES FOR PAVEMENT SUSTAINABILITY5
PROFIT DISTRIBUTION IN IPD PROJECTS BASED ON WEIGHT FUZZY COOPERATIVE GAMES5
ONTOLOGY-BASED HBIM FOR HISTORIC BUILDINGS WITH TRADITIONAL WOODWORK IN TAIWAN4
EXPLORING THE EFFECT OF STAKEHOLDER RELATIONSHIP QUALITY ON TECHNOLOGICAL INNOVATION IN OFF-SITE CONSTRUCTION: THE MEDIATING ROLE OF THE KNOWLEDGE SHARING4
INFORMATION-FLOW-BASED SAFETY EDUCATION (IFSE): AN INDISPENSABLE PERSPECTIVE ON SAFETY EDUCATION4
AN INTEGRATED SCIENTOMETRIC AND SNA APPROACH TO EXPLORE THE CLASSICS IN CEM RESEARCH4
A SYSTEMATIC REVIEW OF THE PUBLIC–PRIVATE PARTNERSHIP LITERATURE PUBLISHED BETWEEN 2012 AND 20214
DESIGN OF A SMART PREFABRICATED SANITISING CHAMBER FOR COVID-19 USING COMPUTATIONAL FLUID DYNAMICS4
AUTOMATIC SAFETY EVALUATION AND VISUALIZATION OF SUBWAY STATION EXCAVATION BASED ON BIM-FEM/FDM INTEGRATED TECHNOLOGY4
AUTOMATED CHECKING SYSTEM FOR MODULAR BIM OBJECTS4
IMPROVED EIGHT-PROCESS MODEL OF PRECAST COMPONENT PRODUCTION SCHEDULING CONSIDERING RESOURCE CONSTRAINTS4
THE RUTTING RESISTANCE AND RESILIENT MODULI OF PRE-VULCANIZED LIQUID NATURAL RUBBER MODIFIED ASPHALTIC CONCRETE IN WARM-MIX TEMPERATURE CONDITION4
COMPETITIVE ADVANTAGES AND BARRIERS IN INTERNATIONAL CONSTRUCTION: AN ORIGIN-HOST MARKET APPROACH4
READINESS ASSESSMENT FOR BIM-BASED BUILDING PERMIT PROCESSES USING FUZZY-COPRAS4
HOW TO GET INTERNATIONAL CONSTRUCTION PROJECTS DELIVERED ON TIME: FROM CHINESE CONTRACTORS’ PERSPECTIVE3
COLLAPSE WARNING SYSTEM USING LSTM NEURAL NETWORKS FOR CONSTRUCTION DISASTER PREVENTION IN EXTREME WIND WEATHER3
UNDERSTANDING THE CHANGES IN CONSTRUCTION PROJECT MANAGERS’ COMPETENCES THROUGH RESUME DATA MINING3
DEVELOPMENT OF AN ADVANCED COMPOSITE SYSTEM FORM FOR CONSTRUCTABILITY IMPROVEMENT THROUGH A DESIGN FOR SIX SIGMA PROCESS3
RESOURCE LEVELLING IN REPETITIVE CONSTRUCTION PROJECTS WITH INTERRUPTIONS: AN INTEGRATED APPROACH3
CONSTRUCTION CHANGE ORDER MANAGEMENT PROJECT SUPPORT SYSTEM UTILIZING DELPHI METHOD3
A MODEL TO REDUCE EARTHMOVING IMPACTS3
BALANCED APPROACH FOR TENDERING PRACTICE AT THE PRE-CONTRACT STAGE: THE UK PRACTITIONER’S PERSPECTIVE3
EFFECTIVE ALLOCATION OF MANPOWER IN THE PRODUCTION OF PRECAST CONCRETE ELEMENTS WITH THE USE OF METAHEURISTICS3
AN EVIDENCE-BASED RISK DECISION SUPPORT APPROACH FOR METRO TUNNEL CONSTRUCTION3
EMBEDDED REMOTE GROUP ENVIRONMENT THROUGH MODIFICATION IN MACBETH – AN APPLICATION OF CONTRACTOR’S SELECTION IN CONSTRUCTION3
STATUS QUO AND FUTURE TRENDS OF BIM-BASED COORDINATION RESEARCH: A CRITICAL REVIEW3
EXPERIMENTAL AND NUMERICAL STUDY ON COLUMN-FOUNDATION CONNECTION THROUGH EXTERNAL SOCKET3
CRITICAL FACTORS INFLUENCING INVENTORY AND PROCUREMENT SYSTEM OF INFRASTRUCTURE PROJECTS3
0.017793893814087