Journal of Scheduling

Papers
(The TQCC of Journal of Scheduling is 3. The table below lists those papers that are above that threshold based on CrossRef citation counts [max. 250 papers]. The publications cover those that have been published in the past four years, i.e., from 2020-11-01 to 2024-11-01.)
ArticleCitations
Optimization of scheduling problems with deterioration effects and an optional maintenance activity20
Exact and metaheuristic approaches for unrelated parallel machine scheduling20
Algorithm selection and instance space analysis for curriculum-based course timetabling16
Minimizing the total tardiness and job rejection cost in a proportionate flow shop with generalized due dates14
Stand-alone renewable power system scheduling for a green data center using integer linear programming12
Tabu search for a parallel-machine scheduling problem with periodic maintenance, job rejection and weighted sum of completion times12
A mixed-integer programming approach for solving university course timetabling problems12
Multi-neighborhood simulated annealing for the sports timetabling competition ITC202110
A graph-based MIP formulation of the International Timetabling Competition 20199
Simulated annealing with penalization for university course timetabling8
Aircraft landing planning under uncertain conditions8
Column generation for minimizing total completion time in a parallel-batching environment7
Twin-crane scheduling during seaside workload peaks with a dedicated handshake area7
A hybrid evolutionary approach to job-shop scheduling with generic time lags7
A reinforcement learning algorithm for rescheduling preempted tasks in fog nodes5
Plant shutdown maintenance workforce team assignment and job scheduling5
Coupled task scheduling with time-dependent processing times5
A parallelized matheuristic for the International Timetabling Competition 20195
An analysis of the parameterized complexity of periodic timetabling5
Scheduling for multi-robot routing with blocking and enabling constraints5
A memetic algorithm to address the multi-node resource-constrained project scheduling problem5
Optimizing rest times and differences in games played: an iterative two-phase approach4
Local search approaches for the test laboratory scheduling problem with variable task grouping4
A flexible mixed integer programming-based system for real-world nurse rostering4
Scheduling periodic I/O access with bi-colored chains: models and algorithms4
Parallel solutions for preemptive makespan scheduling on two identical machines4
Scheduling coupled tasks with exact delays for minimum total job completion time4
Introducing UniCorT: an iterative university course timetabling tool with MaxSAT4
Optimally rescheduling jobs with a Last-In-First-Out buffer4
Scheduling to maximize the weighted number of on-time jobs on parallel machines with bounded job-rejection4
Bi-criteria simulated annealing for the curriculum-based course timetabling problem with robustness approximation4
Automatically evolving preference-based dispatching rules for multi-objective job shop scheduling4
Project scheduling in a lean environment to maximize value and minimize overruns4
Competitive two-agent scheduling with release dates and preemption on a single machine4
A new algorithm for the two-machine open shop and the polynomial solvability of a scheduling problem with routing4
Makespan minimization with OR-precedence constraints3
A general scheme for solving a large set of scheduling problems with rejection in FPT time3
Integrated break and carryover effect minimization3
On the tractability of hard scheduling problems with generalized due-dates with respect to the number of different due-dates3
Routing two stacking cranes with predetermined container sequences3
More on ordered open end bin packing3
A large neighborhood search approach for the paint shop scheduling problem3
Complexity and algorithms for min cost and max profit scheduling under time-of-use electricity tariffs3
A tight approximation ratio of a list scheduling algorithm for a single-machine scheduling problem with a non-renewable resource3
Single-machine scheduling with resource-dependent processing times and multiple unavailability periods3
0.019160985946655