Canadian Journal of Civil Engineering

Papers
(The TQCC of Canadian Journal of Civil Engineering is 3. The table below lists those papers that are above that threshold based on CrossRef citation counts [max. 250 papers]. The publications cover those that have been published in the past four years, i.e., from 2020-11-01 to 2024-11-01.)
ArticleCitations
Effect of particle size and CO2 treatment of waste cement powder on properties of cement paste63
A review on rejuvenating materials used with reclaimed hot mix asphalt31
Strength development of cemented tailings materials containing polycarboxylate ether-based superplasticizer: experimental results on the effect of time and temperature22
Discharge estimation in converging and diverging compound open channels by using adaptive neuro-fuzzy inference system19
Leveraging in situ resources for lunar base construction18
Influence of surface footing loading on soil arching above multiple buried structures in transparent sand17
Strengthening of shear deficient RC deep beams using GFRP sheets and mechanical anchors16
Seismic fragility assessment of multi-span concrete highway bridges in British Columbia considering soil–structure interaction16
Mechanical performance of engineered cementitious composites incorporating recycled glass powder16
A meta-analysis of critical causes of project delay using Spearman’s rank and relative importance index integrated approach16
Real-time winter road surface condition monitoring using an improved residual CNN15
Managing sewerage networks using both failure modes, effects and criticality analysis (FMECA) and analytic hierarchy process (AHP) methods14
Hybrid fuzzy system dynamics model for analyzing the impacts of interrelated risk and opportunity events on project contingency13
Numerical performance assessment of buried corrugated metal culvert subject to service load conditions13
Identification of critical risks in international engineering procurement construction projects of Chinese contractors from the network perspective12
Evolutionary game analysis of government supervision and private sector ecological technology innovation behavior for water environment treatment PPP projects on the basis of public participation12
Detecting potholes in asphalt pavement under small-sample conditions based on improved faster region-based convolution neural networks12
Structural evaluation of invert-cut circular and arch shape corrugated steel pipes through laboratory testing12
Characterizing site investigation performance in a two layer soil profile11
Three-dimensional numerical simulation of local scour around circular side-by-side bridge piers with ice cover11
AI-based cloud computing application for smart earthmoving operations11
Prediction of pressure coefficient on setback building by artificial neural network11
Chemical attack on concrete containing a high volume of crumb rubber as a partial replacement for fine aggregate in engineered cementitious composite (ECC)10
Investigating factors affecting injury severity in bicycle–vehicle crashes: a day-of-week analysis with partial proportional odds logit models10
Construction and resource short-term planning using a BIM-based ontological decision support system10
Climate change impact and adaptation for highway asphalt pavements: a literature review10
Investigating the effects of inelastic soil–foundation interface response on the seismic demand of soil–structure systems10
Effect of activators in different ratios on compressive strength of geopolymer concrete10
Behavior of asphalt mastics containing different materials as filler10
Simultaneous effects of nanosilica and basalt fiber on mechanical properties and durability of cementitious mortar: an experimental study9
An experimental and numerical investigation of pullout behavior of ductile iron water pipes buried in sand9
A modified rheological model for the dynamic modulus of asphalt mixtures9
Seismic performance of concrete walls reinforced by high-strength bars: cyclic loading test and numerical simulation9
Behavior of high-performance RC composite corbels with inclined stirrups9
Clear-water and live-bed scour depth modelling around bridge pier using support vector machine9
Analysis of the impacts of risk factors on teenage and older driver injury severity using random-parameter ordered probit9
Analytical study of the seismic performance of all-steel buckling-restrained braces with H-shaped cores9
Lane-based vehicular speed characteristics analysis for freeway work zones using aerial videos8
Parametric study of multi-story, perforated, partially grouted masonry walls subjected to in-plane cyclic actions8
Optimizing snowplow routes using all-new perspectives: road users and winter road maintenance operators8
Development of ductility-related modification factor for CLT-coupled wall buildings with replaceable shear link coupling beams8
Properties of slag geopolymer concrete modified with fly ash and silica fume8
4D-based automation of heavy lift planning in industrial construction projects8
Winter road surface condition classification using convolutional neural network (CNN): visible light and thermal image fusion8
Mobile crowdsourcing-based data collection for user-centered facility maintenance management7
Crowd behaviour in Canadian football stadia — Part 2: Modelling7
A comparison of project delivery method performance for water infrastructure capital projects7
Icing and aufeis in cold regions I: the origin of overflow7
Predictive model for construction labour productivity using hybrid feature selection and principal component analysis7
An elicitation process to quantify Bayesian networks for dam failure analysis7
Estimating lateral placement and lane indiscipline of urban mixed traffic of a developing country: an ANN-assisted approach7
Drivers’ ability to distinguish consecutive horizontal curves7
State of watermain infrastructure: a Canadian case study using historic pipe break datasets7
Methodology for seismic risk screening of existing buildings in Canada: Structural scoring system7
Development of a multi-modal overlay tester for the evaluation of asphalt overlay cracking behaviors7
The calibration challenge when inferring longitudinal track profile from the inertial response of an in-service train7
An explicit expression for velocity profile in presence of secondary current and sediment in an open channel turbulent flow7
Bridge infrastructure resilience assessment against seismic hazard using Bayesian best worst method7
Form friction factor of armored riverbeds7
Experimental study on the flexural behavior of flat steel – concrete composite beam7
Crowd behaviour in Canadian football stadia — Part 1: Data collection6
Exploring road safety of pedestrians in proximity to public transit access points (bus stops and metro stations), a case study of Montreal, Canada6
Investigating the transferability of Bayesian hierarchical extreme value model for traffic conflict-based crash estimation6
Effect of alkali activator dosage on compressive and tensile strength of ground granulated blast furnace slag based geopolymer concrete6
Using single and multiple unmanned aerial vehicles for microscopic driver behaviour data collection at freeway interchange ramps6
Direct generation of floor design spectra (FDS) from uniform hazard spectra (UHS) — Part I: formulation of the method6
Application of a multi-objective optimization model for the design of Piano Key Weirs with a fixed dam height6
Development of performance limit states for concrete bridge piers with high strength concrete and high strength steel reinforcement6
Rheological, mechanical, and abrasion characteristics of polymer-modified cement mortar and concrete6
Investigation of texture effects at interlayer bonding behavior between asphalt concrete (AC) overlay on Portland cement concrete (PCC)6
Effect of water-to-cement ratio on cracking resistance of concrete at early age in restrained ring specimens6
Laboratory evaluation of cracking resistance for asphalt mixtures modified with nanoclay and nanocellulose6
Enhanced repetitive scheduling formulation for meeting deadlines and resource constraints in linear and scattered projects6
Optimal seismic isolation characteristics for bridges in moderate and high seismicity areas6
Information entropy evaluation model of bus-line reliability considering the combination of bus stops and bus travel time6
Knowing what is going on—a smart contract for modular construction6
Performance comparison of asphalt emulsion stabilized granular base modified with cement or asphaltenes6
Direct generation of floor design spectra (FDS) from uniform hazard spectra (UHS) — Part II: extension and application of the method6
Improving estimate at completion (EAC) cost of construction projects using adaptive neuro-fuzzy inference system (ANFIS)6
Steel buried structures: condition of Ontario structures and review of deterioration mechanisms and rehabilitation approaches6
Methodology for seismic risk screening of existing buildings in Canada: Non-structural component scoring system5
Tensile behaviour of ultra-high-performance steel fiber reinforced concrete5
Hydraulics of flow over full-cycle cosine and rectangular sharp-crested weirs5
Concrete-filled hollow structural sections. I: Materials, cross-section classification, and concentrically loaded columns5
Developing SonReb models to predict the compressive strength of concrete using different percentage of recycled brick aggregate5
Simplified material model for concrete containing high-content of tire-derived coarse aggregate under compression loading5
Human-centric robotic manipulation in construction: generative adversarial networks based physiological computing mechanism to enable robots to perceive workers’ cognitive load5
Alternative to AHP approach to criteria weight estimation in highway bridge management5
Evaluating the dynamic behavior of railway-bridge transition zone: numerical and field measurements5
Classification of surface pavement cracks as top-down, bottom-up, and cement-treated reflective cracking based on deep learning methods5
Development of ‘speed ratio’ based level of service criteria on undivided urban streets in mixed traffic context5
Experimental study on sulfate erosion resistance of nano-CaCO3 modified concrete5
Development length of glass fibre reinforced polymer (GFRP) rebar based on non-uniform bond stress5
Automatic manpower allocation for public construction projects using a rough set enhanced neural network5
Modeling earthmoving operations in real time using hybrid fuzzy simulation5
Formwork systems selection criteria for building construction projects: a critical review of the literature5
Anchorage capacity of headed bars in steel fiber reinforced concrete5
Asphalt pavement friction coefficient prediction method based on genetic-algorithm-improved neural network (GAI-NN) model5
Exploring the current challenges and emerging approaches in whole building life cycle assessment5
Analysis on hazard perception ability of drivers in plateau areas: by different elevations5
Dynamic response of reinforced concrete sheds against the impact of rock block with different shapes and angles5
Optimizing the prefabrication finishing level in modular construction5
Concrete-filled hollow structural sections. II: Flexural members, beam-columns, tension, and shear4
Experimental investigation of RC columns confined with Ni–Ti shape memory alloy wires versus CFRP sheets4
Integrating model tree and modified stepwise regression in concrete slump prediction and steel fabrication estimating4
Influence of mix ratio of potato peel and pig manure on reaction kinetics and methane recovery from anaerobic co-digestion4
Safety effects of maintenance treatments to improve pavement condition on two-lane rural roads — insights for pavement management4
Experimental investigation of 90° intake flow patterns with and without submerged vanes under sediment feeding conditions4
An analysis of quality liability insurance for prefabricated components using evolutionary game theory4
Turbulent flow characteristics responsible for current-induced scour around a complex pier4
Review and recommendations for structural testing of buried gravity storm drain pipes and culverts4
A gradient based optimization procedure for finding axle weights in probabilistic bridge weigh-in-motion method4
Accommodation of freeway merging in a mixed traffic environment including connected autonomous vehicles4
Use of spur dikes with different permeability levels for protecting bridge abutment against local scour under unsteady flow conditions4
Modelling a cost profile for road projects4
Corrosion resistance of fiber-reinforced geopolymer structural concrete in a simulated marine environment4
Fire residual stress–strain curves of corroded thermo-mechanically treated (TMT) reinforcing steel bars4
Simulation of design changes impact in healthcare construction projects using system dynamics4
Assessing the assessor: a framework for BIM maturity, capacity, and competency evaluation at the organizational level4
Semi-quantitative seismic risk screening tool for existing buildings in Canada4
Investigation of layered composite plates under acoustic emission using an appropriate finite element model4
Precision enhancement of smartphone sensor-based pavement roughness estimation by standardizing host vehicle speed4
Shear strength characterization and sustainability assessment of coal bottom ash concrete4
Dynamic stakeholder salience mapping framework for highway route alignment decisions: China–Pakistan Economic Corridor as a case study4
Crack grid detection and calculation based on convolutional neural network4
Exploring implicit relationships between pavement surface friction and vehicle crash severity using interpretable extreme gradient boosting method4
Hydropower intake-induced fish entrainment risk zone analysis4
Digitalization Opportunities Road Mapping Tool (DORMT©): A framework to assess digitalization opportunities in construction organizations4
Stability analysis of double V-shaped gully embankment: dimension-reduced calculation method4
Icing and aufeis in cold regions II: consequences and mitigation4
Material properties for fracture mechanics based strength assessment of cast iron water mains4
Ultrasonic and acoustic pulse velocity methods for nondestructive detection of early decay in wood poles3
A resource optimization framework for improving railway-highway grade crossing safety in Canada3
Durability of concrete containing gypsum powder recycled from waste drywalls combined with high content of fly ash as supplementary cementing materials3
A dynamic modelling of labor productivity impacts arising from change orders in road projects3
Utilization potentials of a nano bio-carbonate filler to mitigate alkali-aggregate reactivity of glass powder–foamed concrete3
Life cycle assessment of asphalt pavement maintenance and rehabilitation techniques: a study for the City of St. John’s3
Fire evacuation modelling of a Canadian wildland urban interface community3
A simplified seismic design method for limited-ductility steel multi-tiered concentrically braced frames in moderate seismic regions3
Considerations in the planning and design of bridges in ice-affected rivers: a review3
Seismic fragility assessment of bridge piers incorporating high-strength steel reinforcement and concrete under near-fault ground motions3
Hydrologic impacts of climate change in relation to Ontario’s source water protection planning program3
Characterisation and pore structure analysis of mortar incorporating valorised rice husk ash3
Competency and performance measures for organizations in the construction industry3
Numerical analysis of the ground-mounted solar PV panel array mounting systems subjected to basic wind for optimum design3
Seismic reliability assessment of base-isolated bridges in Quebec3
Benchmark NBC editions for seismic risk management of existing buildings in Canada3
A case for adding an inspection level related to structural health monitoring (SHM) for bridge evaluation3
Stability coefficient of interlocking compressed earth block masonry under axial compression3
Experimental and numerical study of axially loaded reinforced concrete columns and frame columns under lateral impact loading3
Uncertainty quantification of wall thickness of onshore gas transmission pipelines3
Prediction of corrosion potential using the generalized artificial neural networks method3
Feature representation improved Faster R-CNN model for high-efficiency pavement crack detection3
Generating labour cost budget for a construction-oriented fabrication facility: simulation-based resource scheduling approach3
Agent-based simulation of workers’ behaviors, productivity, and safety around construction obstacles3
Numerical assessment of lateral deflection equation of single-storey light-frame wood shear walls3
Analysis of the effect of superheavy load vehicles: a review of current criteria3
Bench to full-scale enhanced primary treatment of municipal wastewater under wet weather flow for minimized pollution load: evaluation of chemical addition and process control indicators3
Live load factors for military traffic in bridge evaluation3
Hybrid treatment system to remove micromolecular SMPs from fruit wastewater treated with an MBR3
Fostering a cast-in-place steel–UHPFRC connector for ductile timber–concrete composite structures: parametric study of the shear behaviour and design considerations3
A new hybrid steel–timber rocking seismic force resisting system equipped with U-shaped fuse connections3
Finite element-based parametric and forensic analysis of corrosion-induced structural deterioration in prestressed concrete bridge girders3
A comparative study of floor accelerations of different structural systems with lead-rubber-bearing (LRB) isolators3
The rheological behavior and high-low temperature performance of warm SBS/rubber asphalt3
Human-like speed modeling for autonomous vehicles during car-following at intersections3
Effects of aspect ratio on higher-order moments, conditional statistics, TKE budget and anisotropy in narrow open channel flow3
Seismic performance assessment of an existing multispan bridge in eastern Canada retrofitted with fiber reinforced elastomeric isolator3
On the implementation of the dynamically zoned target release reservoir model in the GEM-Hydro streamflow forecasting system3
Mechanical properties of bamboo after exposure to low temperatures3
Modeling commercial vehicle trip generation at the business-establishment level3
A fibre-based modelling technique for the seismic analysis of steel–concrete composite shear walls3
Empirical correlation of the modified wheel tracker (MWT) and the dynamic creep test for evaluating the permanent deformation of hot mix asphalt (HMA)3
Effect of curing conditions on the compressive strength of sodium carbonate activated slag–glass powder mortar3
Influence of headwater reservoirs on climate change impacts and flood frequency in the Kabul River Basin3
Resistance of a silicone membrane to long-term UV and moisture aging in light of climate change3
A system to determine advisory speed limits for horizontal curves based on mental workload and available sight distance3
Assessments of available riverine hydrokinetic energy: a review3
Mechanical performance of lintel-column joint of Chinese traditional style architecture with viscous damper3
Fuzzy analytic hierarchy process framework for quantifying the flood resilience of housing infrastructure systems3
0.06129002571106