Engineering Optimization

Papers
(The H4-Index of Engineering Optimization is 18. The table below lists those papers that are above that threshold based on CrossRef citation counts [max. 250 papers]. The publications cover those that have been published in the past four years, i.e., from 2022-08-01 to 2026-08-01.)
ArticleCitations
A mechanical property prediction system for G-Lattices via machine learning59
Bundle price, buyer’s preference and shipping cost: forming buyers’ groups for bundles of products52
Structural design of a balanced cone-spherical fiber-reinforced rubber hose40
A metaheuristic-based optimization model for flight procedure design36
Parametric approach for multi-objective enhanced interval linear fractional programming problem32
Minimizing total weighted tardiness in parallel machine scheduling with sequence-dependent setup times via fine-tuned large language models28
Relevant interval perturbation method for uncertainty analysis of structural–acoustic coupling model27
Network reconfiguration in the presence of optimally integrated multiple distributed generation units in a radial distribution network27
Non-convex shape optimization by dissipative Hamiltonian flows24
Topology optimization for cyclic periodic structures with frequency objectives of nodal diameter modes24
Hybrid machine learning and optimization method for solar irradiance forecasting24
The problem of assigning bus drivers to trips in a Spanish public transport company23
Solving the flow-shop scheduling problem with human factors and two competing agents with deep reinforcement learning23
An improved bi-population parallel non-dominated sorting genetic algorithm-II used for route planning considering precedence22
A new adaptive two-parameter conjugate gradient method21
A hybrid genetic programming algorithm for the distributed assembly scheduling problems with transportation and sequence-dependent setup times20
On the suitability of simplified sensitivity estimation for partial elements in topology optimization19
Min–max regret-based robust makespan minimization of the unrelated parallel batch processing machine scheduling problem with uncertain processing time18
An adaptive parallel non-probabilistic uncertainty analysis method for engineering structures using a kriging model18
0.1292769908905